torque specs for shovelhead primary

You search Auto repair manual PDF torque specs for shovelhead primary, if there are search results will appear below. If search results do not exist, please search by others keyword.



  torque specs for shovelhead primary Direct Download speed 5282 Kb/s

  torque specs for shovelhead primary Full Version speed 6162 Kb/s



HARLEY DAVIDSON CHROME INNER PRIMARY HOUSING INSTALLATION INSTRUCTION

0

Filed Under (Harley Davidson) by admin on 29-01-2011

download
Kit Contents Table 1. Kit Contents Part Number Description (Quantity) Not sold separately Chrome Inner Primary Housing 786A Sealing fastener (5) INSTALLATION NOTES Whenever the sealing fasteners are loosened or removed, they must be replaced. Always replace using Harley-Davidson® Original Equipment sealing fasteners part 786A. Do not use part 786. The primary housing included in this kit installs in the same manner as the stock inner primary housing with the following exception: Use the five sealing fasteners included with this kit. Install and tighten fasteners to the torque specified below. For 2006 Dyna model motorcycles: Remove dowel pins from the chrome inner primary housing before attempting installation. Using a pair of pliers or vice grips, remove the dowel pins by carefully twisting and pulling on the pins. Be careful not to scratch or mar the chrome or sealing surfaces of the chrome inner primary housing. Remove the chain tensioner anchor plate, bolt and screws from the stock inner primary housing after it has been removed, then install it on the chrome inner primary housing. See the appropriate Service Manual for the proper tightening procedure, and torque specifications. 1. See the Drive section of the appropriate Service Manual, and remove the stock inner primary housing. Clean the internal threads in the crankcase and transmission case where the sealing fasteners were removed using a wire brush. Install the chrome inner primary housing as indicated below. Replace the five stock sealing fasteners with the five bolts included in this kit. Put a light coat of primary oil under the head of the sealing fasteners and then tighten to 23-25 ft- lbs (31-34 Nm)

Incoming search terms:

2008 FLT Police Models Service Manual Supplement

0

Filed Under (Harley Davidson) by admin on 25-11-2010

download
ITEM SERVICED 14-21 ft-lbs (19.0-28.5 Nm) Drain plug torque Engine oil and filter 4 qt. (3.8 L) Oil capacity Hand tighten 1/2-3/4 turn after gasket contact Filter 63798-99A Chrome filter part number 63731-99A Black filter part number FORMULA+ TRANSMISSION AND PRIMARY CHAIN LUBRICATION (Part No. 99851-05) Lubricant type and capacity Primary chain lubricant Wet: 38 oz. (1124 ml) Dry: 45 oz. (1331 ml) 14-21 ft-lbs (19.0-28.5 Nm) Primary chaincase drain plug torque 1/2-1 turn Adjuster screw free play Clutch adjustment 72-120 in-lbs (8.1-13.6 Nm) Adjuster screw locknut torque 1/16-1/8 in. (1.6-3.2 mm) Free play at hand lever 84-108 in-lbs (9.5-12.2 Nm) Clutch inspection cover torque Dipstick at FULL with motorcycle on jiffy stand and filler plug resting on threads. Lubricant level Transmission lubricant FORMULA+ TRANSMISSION AND PRIMARY CHAIN LUBRICATION (Part No. 99851-05) Lubricant type and capacity 32 oz (0.95 liters) 14-21 ft-lbs (19.0-28.5 Nm) Transmission drain plug torque 25-75 in-lbs (2.8-8.5 Nm) Transmission filler plug/dipstick torque Front: 36 psi (248 kPA) Pressure: solo rider Tire pressure and wear Rear: 36-40 psi (248-276 kPA) Replace if less than 1/32 in. (0.8 mm) of tread pattern Wear 55 in-lbs (6.2 Nm) minimum Spoke nipple torque Wheel spokes 99953-99A (12 oz.) D.O.T. 4 hydraulic brake fluid part number Brake fluid level Front: 0.20 in. (5.0 mm) Fluid level (from top of master cylinder reservoir) Rear: 0.26 in. (6.5 mm) Front: 7-10 in-lbs (0.8-1.1 Nm) Master cylinder reservoir cover screw torque Rear: 12-15 in-lbs (1.4-1.7 Nm) 0.016 in. (0.4 mm) Minimum brake pad thickness Brake pads and discs 75-102 in-lbs (8.5.-11.5 Nm) Brake caliper pad pin torque Front: 0.18 in. (4.5 mm) Minimum brake disc thickness Rear: 0.25 in. (6.3 mm) 0.008 in. (0.2 mm) Maximum brake disc lateral runout (warpage) 10 lb. (4.5 kg) Upward force applied at midpoint of bottom belt strand Drive belt deflection 3/8-7/16 in. (9.5-11.1 mm) FLHTP 1/4-5/16 in. (6.4-7.9 mm) FLHP/FLHPE 40-60 in-lbs (4.5-6.8 Nm) Air cleaner cover bracket screw torque Air cleaner 36-60 in-lbs (4.1-6.8 Nm) Air cleaner cover screw torque LOCTITE MEDIUM STRENGTH THREADLOCKER 243 (BLUE) Air cleaner cover screw Threadlocker Part No. 99642-97 (6 ml) LUBIT-8 SUPER OIL, Part No. 94968-85TV (1/4 fl. oz.) Lubricant part number Clutch cable 35-45 in-lbs (4.0-5.1 Nm) Handlebar switch housing screw torque

Incoming search terms:

Harley-Davidson Softail Conversion Kit Installation Instructions

0

Filed Under (Harley Davidson) by admin on 02-12-2010

download
1. Place the motorcycle on the lift. 2. Place a suitable Jack under the Frame of the Motorcycle and tie down securely. 3. Remove Drain Plug from Primary Cover Assembly and drain oil. 4. Slide Rubber Boot off of the Clutch Cable Adjuster. Loosen and back the Jam nut away from the Clutch Cable Adjuster. Move Clutch Cable Adjuster towards the Jam Nut to introduce free play in the Clutch Lever. 5. Remove the fasteners that secure the seat. Remove seat. 6. Disconnect negative Battery Terminal. 7. Remove the Saddle Bags. And their hardware. If equipped. 8. Loosen Muffler Clamp on both Mufflers and other attaching hardware. Remove and discard both Mufflers. 9. Loosen the 4 exhaust stud nuts and save. Remove and discard head pipes and exhaust gaskets. 10. Disconnect the Rear Lamp Wiring Harness. 11. Remove any fasteners from Electrical Box. 12. Remove and discard Rear Fender, Fender Support and fasteners. NOTE: 2008-Current various models. Remove ECM from Fender and save nuts. 13. Drain all Brake Fluid from the Rear Brake System. 14. Un-clamp Rear Brake Line from the frame and Rear Fork. 15. Remove and discard both Banjo Bolts and Crush Washers from the Rear Brake Caliper and the Rear Brake Master Cylinder. 16. Remove Brake Light Switch from the Brake line, Save for reassembly. 17. Remove the Torx screw from the Brake Line bracket, Save the Torx screw for reassembly. 18. Remove and Discard Brake Line. 19. If Lower Controls option. Remove and Discard right and left floorboards/foot pegs, brake pedal, shifter, and shift linkage. Remove and Discard Passenger Foot pegs or Floorboards and their mounts. Then skip to step 24. 20. If Lower Controls Not purchased. Continue. 21. Remove acorn nut from Shift Linkage. 22. Remove 3 fasteners from Drivers Floorboard and remove. 23. Remove and discard Jiffy Stand. 24. Remove the Primary Cover by first removing the top and rear inspection cover screws. 25. Continue by removing remaining fasteners. 14 total. 26. Remove and discard Primary Cover Gasket. 27. Clean residual gasket material from both surfaces. 28. Loosen the Top Center Nut on the Primary Chain Adjuster. Lower the Primary Chain Adjuster until it rests flat on the Inner Primary Cover. 29. Remove the Clutch Lifter Retaining Ring from the Clutch Basket. Remove Clutch Lifter Assembly. 30. Using the Primary Drive Locking Tool. Loosen the Compensating Sprocket Nut. 31. Using the Primary Drive Locking Tool. Loosen the Clutch Hub Main shaft Nut. WARNING: This nut is LEFT HAND threaded. 32. Remove the Primary Drive Locking Tool, Compensating Sprocket Nut, and Clutch Hub Main shaft Nut. 33. Remove the Sprocket cover and Sliding Cam from the Crank Shaft Extension. 34. Remove the Clutch Assembly, Primary Chain, Compensating Sprocket, and Crank Shaft Extension in one assembly.

Incoming search terms:

HARLEY DAVIDSON SPORTSTER CHROME PRIMARY TRIM COVER KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 08-03-2011

download
INSTALLATION To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) 1. Refer to the Owner’s Manual and follow the instructions given to remove the seat and disconnect the negative battery cable at the engine crankcase. Retain all seat mounting hardware. 2. Models with mid foot controls: Remove the two screws retaining the left-side rider footrest and mounting bracket assembly. 3. All models: See Figure 1. Note the installed orientation of the transmission foot shift lever to aid in re-assembly. Use a 1/4 in. hex key to remove the socket head screw (5) holding the shift lever (3 or 4) to the transmission shift lever shaft (1). Remove the lever and rubber washer (2). 4 1 5 3 2 5 is 01929 1. Transmission shift lever shaft 2. Rubber washer 3. Foot shift lever (mid control) 4. Shift lever (forward control) 5. Socket head screw Figure 1. Shift Lever Removal 4 2 3 1 is 01930 Figure 2. Primary Cover Mounting Screw Locations NOTE Remove ONLY the four screws shown. 4. See Figure 2 and Figure 3. Remove and discard the primary cover hex-socket head screws from the four locations shown. 5. Refer to CLUTCH CONTROL: REMOVAL: CLUTCH CABLE-LOWER in the Service Manual to remove the clutch cable at the lower end with these exceptions: •The negative battery cable has already been disconnected, and •On mid-control models, the rider footrest has already been removed. 6. See CLUTCH LEVER AND CLUTCH CABLE-UPPER to remove the clutch cable at the upper end. NOTE Be careful not to scratch the paint on the frame tube when removing the clips. 7. Carefully remove the two vinyl-coated spring steel clips that retain the clutch cable to the frame downtube. 8. Obtain all of the items from the kit. 9. See Figure 2. Insert a chrome screw (3), from the outside, through the hole in location 3 on the chrome trim cover. Place the thinner steel spacer (4) onto the threads of the screw from the inside of the trim cover. 10. Use a 5/32 inch hex key on the screw head, and grip one of the Nylon keeper washers (6) with a pliers. Install the washer onto the screw until several threads extend from the washer, capturing the screw and spacer on the trim cover. 11. Insert the remaining chrome screws, from the outside, through the holes in locations 1, 2 and 4 on the chrome trim cover. Place a thicker steel spacer (5) onto the threads of each screw from the inside of the trim cover. 12. Thread a Nylon keeper washer onto each of the screws as described in Step 10. 13. Position the trim cover over the primary cover with the transmission shift lever shaft extending through the clearance hole (A) in the chrome trim cover. 14. Thread one of the chrome screws into the mating primary cover mounting hole for several threads, taking care not to cross-thread the screw in the hole. 15. Carefully start the remaining screws partially into their mating holes. Continue tightening the screws in turn

Incoming search terms:

HARLEY DAVIDSON CHROME INNER PRIMARY COVERS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 23-02-2011

download
INSTALLATION 1 2 3 is06139 Figure 1. Remove Three Original Equipment Screws As Shown 1. See Figure 1. Remove the stock fasteners as shown in Figure 1. Save screw (3) for reuse. 2. Install the stock fastener in the rear inner cover. Place a locating washer over the fastener with the rounded side facing toward the hole in the primary chain case. 3. Slide the rear inner cover into place and loosely secure it with the stock fastener. 1 is06416 1. Acorn nut Figure 2. Fasten Front And Rear Inner Primary Covers Together 4. See Figure 2. Position the front inner cover over the rear inner cover and make sure that the hole in the front cover fits over the threaded stud in the rear cover. Secure the covers together with the acorn nut installed finger tight. 5. See Figure 3 and Table 1. Place the new 4.25 inch (5) and 1-1/2 inch (4) screws in the front inner primary cover. Place locating washers (6) over the fasteners with the rounded side of the washer facing toward the hole in the primary chain case. 6. Tighten all three screws to 108-120 in-lbs (12.2-13.6 Nm) . 7. Tighten the acorn nut. 8. Push the Allen hole plugs (7) into the four exposed screw heads

Yamaha R1 2007-2008 Frame Slider Installation

0

Filed Under (Yamaha) by admin on 01-01-2012

download
Installation Steps: 1. Remove left and right body panels. 2. Remove the left side engine stud. Mount the left side offset using 99-HB-SH10125080 Socket Cap 10 X 1.25 X 80 Main Engine Stud. Tip: Only tighten enough so you can still move the offset by hand. Loosely mount the left side body panel. Adjust the offset so the frame slider when mounted will clear the bodywork. There is also a groove cut in the offset, this is so the body can clear the offset. 3. With the offset in the correct position remove body and torque down to OEM torque specs. 4. Using one drop of blue thread locker mount the left side puck to the offset with 99-HB- SH10150045 Socket Cap 10 X 1.5 X 45 (Holds puck to offset). Torque down to 30 to 32 foot lbs. 5. Remove the right side engine stud. Mount the right side offset using 99-HB-SH10125080 Socket Cap 10 X 1.25 X 80 Main Engine Stud. Tip: Only tighten enough so you can still move the offset by hand. Loosely mount the right side body panel. Adjust the offset so the frame slider when mounted will clear the bodywork. There is also a groove cut in the offset, this is so the body can clear the offset. 6. With the offset in the correct position remove body and torque down to OEM torque specs. 7. Using one drop of blue thread locker mount the right side puck to the offset with 99-HB- SH10150045 Socket Cap 10 X 1.5 X 45 (Holds puck to offset). Torque down to 30 to 32 foot lbs. 8. Mount left and right bodywork

Incoming search terms:

HARLEY-DAVIDSON BIG TWINS COMPUFIRE 1084 GEAR SETS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 26-11-2010

download
1. Remove the seat and disconnect the cables at the battery. Remove the ground cable first and then the positive (+) cable. 2. Drain the oil in the outer primary case and remove the outer primary cover following instructions in the Factory Shop manual. 3. Bend the tab on the jackshaft bolt away from the bolt head. Remove the starter pinion gear with the jackshaft bolt, lock plate and washer. 4. Remove the clutch assembly using the procedure found in the Factory Shop manual. 5. Remove the original equipment ring gear from the clutch basket by drilling out the rivets with a 5/16-inch drill bit. Drill through the rivet head and tap the ring gear off the clutch basket using a hammer. 6. Drill out the six holes in the clutch basket with the 5/16-inch drill bit. RING AND STARTER PINION GEAR INSTALLATION 1. Attach the new 84-tooth ring gear to the clutch basket using the six 5/16×24 socket head cap screws supplied. NOTE… The bevel side of the ring gear (identified by the three dots) faces away from the starter motor. Torque the socket head cap screws to 29 ft lbs. 2. Assemble and install the primary drive assembly following the instructions in the factory Shop manual. 3. Install the new 10-tooth pinion gear with the jackshaft bolt, lock plate and thrust washer. Torque the jackshaft bolt to 7 – 9 ft lbs. Bend the lock tab on the lock plate against a flat on the jackshaft bolt head. 4. Measure and adjust the air gap between the ring gear and the pinion gear. See Fig-1 . The correct gap is .075 – .125 inch. If the gap is larger than .125 inch, use the supplied shim washers inside the jackshaft coupler. See Fig-2 . If the air gap is smaller than .075 inch, the jackshaft must be shortened by removing material from the splined end of the shaft. See Fig-3 . 5. Install the outer primary cover following instructions in the Factory Shop manual and refill the primary case with the proper amount of primary oil. 6. Re-install the battery cables in the reverse order they were removed. Re-install the seat

Incoming search terms:

COMPUFIRE 1084 GEAR SETS INSTALLATION INSTRUCTIONS

0

Filed Under (Tips and Review) by admin on 26-11-2010

download
1. Remove the seat and disconnect the cables at the battery. Remove the ground cable first and then the positive (+) cable. 2. Drain the oil in the outer primary case and remove the outer primary cover following instructions in the Factory Shop manual. 3. Bend the tab on the jackshaft bolt away from the bolt head. Remove the starter pinion gear with the jackshaft bolt, lock plate and washer. 4. Remove the clutch assembly using the procedure found in the Factory Shop manual. 5. Remove the original equipment ring gear from the clutch basket by drilling out the rivets with a 5/16-inch drill bit. Drill through the rivet head and tap the ring gear off the clutch basket using a hammer. 6. Drill out the six holes in the clutch basket with the 5/16-inch drill bit. RING AND STARTER PINION GEAR INSTALLATION 1. Attach the new 84-tooth ring gear to the clutch basket using the six 5/16×24 socket head cap screws supplied. NOTE… The bevel side of the ring gear (identified by the three dots) faces away from the starter motor. Torque the socket head cap screws to 29 ft lbs. 2. Assemble and install the primary drive assembly following the instructions in the factory Shop manual. 3. Install the new 10-tooth pinion gear with the jackshaft bolt, lock plate and thrust washer. Torque the jackshaft bolt to 7 – 9 ft lbs. Bend the lock tab on the lock plate against a flat on the jackshaft bolt head. 4. Measure and adjust the air gap between the ring gear and the pinion gear. See Fig-1 . The correct gap is .075 – .125 inch. If the gap is larger than .125 inch, use the supplied shim washers inside the jackshaft coupler. See Fig-2 . If the air gap is smaller than .075 inch, the jackshaft must be shortened by removing material from the splined end of the shaft. See Fig-3 . 5. Install the outer primary cover following instructions in the Factory Shop manual and refill the primary case with the proper amount of primary oil. 6. Re-install the battery cables in the reverse order they were removed. Re-install the seat

Incoming search terms:

HARLEY DAVIDSON XLH 1200cc BIG BORE KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 06-03-2011

download
Boring and Honing Procedures 1. Check again for burrs on cylinder gasket surfaces and remove burrs before performing Step 2. 2. Install original head and base gaskets, CYLINDER TORQUE PLATES (Part Number 33446-A) and TORQUE BOLTS (Part Number 33446-4). Tighten TORQUE BOLTS following tightening procedure given in the INSTALLATION, CYLINDER HEAD procedure in the ENGINE section of the Service Manual. NOTE Torque plates, properly tightened and installed with gaskets, simulate engine operating conditions. Measurements will vary as much as 0.001 inch without torque plate. 3. The cylinder must be bored with gaskets and torque plates attached. Bore the cylinder to 0.003 inch under the desired finish size. 1 WARNING CAUTION CAUTION 1 WARNING Kit Number 4. Hone the cylinder to its finished size (See Figure 1) using a 280 grit rigid hone followed by a 240 grit flexible ball hone. Honing must be done with torque plates attached. All honing must be done from the bottom (crankcase) end of the cylinder. Work for a 60 degree crosshatch pattern. 5. See Figure 1. After machining and honing, chamfer the bottom edge of the cylinder liner. the chamfer provides a beveled surface for easier installation of the cylinder over the piston rings. Break leading edge of liner to a flat surface. The bottom edge of the liner will be somewhat sharp after machining. This sharp edge could easily be damaged during installation of the cylinder. Piston Installation The 1200cc pistons have an arrow on the top of the piston. This arrow must face the front of the engine when piston is installed. There is no front cylinder piston or rear cylinder piston. New pistons can be installed in either cylinder. Check piston rings for proper side clearance and end gap (See XLH Service Manual). Be sure end gaps of adjacent rings are installed 90 degrees apart. Assembly Follow assembly and torque specifications given in the ENGINE section of the applicable Service Manual. Replace original gaskets, O-rings and seals with new components furnished in kit. NOTE Push rod covers on 1991 and later models are one-piece and the correct O-rings are as follows: Bottom – Part Number 17944-89 Upper – Part Number 11190 Engine Break In For the first 500 miles, to wear-in critical parts, observe these few simple driving rules: During the first 50 miles, keep the engine speed below 2500 RPM in any gear. Up to 500 miles, vary the engine speed, avoiding any steady speed for long distances. Engine speed up to 3000 RPM is permissible in any gear. Avoid fast starts at wide open throttle. Drive slowly until engine warms up. Avoid running the engine at extremely low RPM in higher gears. 2 of 3 -J00001 1200cc CYLINDER FINAL BORE SIZE AFTER HONING STANDARD BORE DIAMETER 3.4980 inch + 0.0002 inch Figure 1. Bottom Edge of Cylinder Liner Chamfer i04852 Break Edge to Flat Surface

Incoming search terms:

YAMAHA YZF-R1P YZF-R1PC ASSEMBLY MANUAL

0

Filed Under (Yamaha) by admin on 26-02-2011

download
PREPARATION To assemble the motorcycle correctly, supplies and working space are required. Supplies oils, greases, shop rags. Workshop The workshop where the motorcycle is assembled should be clean and large. The floor should be level. Self-protection Protect your eyes with suitable safety spectacles or safety goggles when using compressed air, when grinding or when doing any operation which may cause particles to fly off. Product hands and feet by wearing safety gloves or doing. SYMBOLS USED ON CRATE CARTON Contents of the transport package are fragile therefore it shall be handled with care. Indicates correct upright position of the transport package. Transport package shall be kept away from rain. Insertion of the lift arm from this side is prohibited. Lift arm inserting position. -1- UNPACKING 1. Remove the frame cover 1. NOTE: To remove the frame cover, cut the vinyl bands around the cover using a cutter or scissors. 2. Remove the bolts 2 (upper bracket). 3. Remove the bolt 3 (front tire). 4. Remove the packing frames 4 (upward and sideways). NOTE: Remove the bolts while holding frame. NOTE: Before starting the assembly, check for damaged or missing parts. The parts are contained in the cartan and the motorcycle for damage, scratches and other defects. -2- PARTS LOCATION 1 Carton box -3- 1 Carton box Screw, washer and special nuts (windscreen) Bolt (front master cylinder) Bolt (handle crown and handlebar) Nut (rear view mirror) Nut (front reflector) Front reflector Vinyl bag 1 Plugs (handle crown) Owner’s manual Rear view mirrors Windscreen – -5- 1. Handlebar 1 2 3 4 5 6 1 1 1 1 2 1 Reservoir tank (brake) Hexagon socket bolt Crown nut Hexagon socket bolt Cap Hexagon socket bolt * V * V V * d = 6 (0.24), r= 12 (0.47) d = 6 (0.24), r= 25 (0.98) d = 8 (0.31), r= 30 (1.18) 2. Front reflector A: Tighten the crown nut to specified torque. Tightening torque: 115 Nm (11.5 m • kg, 85.0 ft • lb) B: Tighten the bolt to specified torque. Tightening torque: 13 Nm (1.3 m • kg, 9.4 ft • lb) C: Tighten the bolt to specified torque. Tightening torque: 13 Nm (1.3 m • kg, 4.4 ft • lb) A: Tighten the screws to specified torque. Tightening torque: 40 Nm (4.0 m • kg, 29 ft • lb) 1 2 3 4 5 2 2 2 4 4 Reflector bracket Reflector Nut Washer Caliper bolt * V V * * d = 5 (0.20) d = 10 (0.39) d = 10 (0.39), r= 30 (1.18) 3. Clutch cable 1 Clutch cable 1 * A: Check the clutch lever for smooth action. CAUTION: Proper cable routing is essential to assure safe motorcycle operation. Refer to “CABLE ROUTING

Incoming search terms:

Incoming search terms: