150cc quad bike wiring diagram

You search Auto repair manual PDF 150cc quad bike wiring diagram, if there are search results will appear below. If search results do not exist, please search by others keyword.



  150cc quad bike wiring diagram Direct Download speed 5282 Kb/s

  150cc quad bike wiring diagram Full Version speed 6162 Kb/s



Harley-Davidson touring bikes WHEELDOCK EZ-UP Center Stand Installation Instructions

0

Filed Under (Harley Davidson) by admin on 18-04-2012

download
Unlike other center stands, the WHEELDOCK EZ UP stand requires very little effort to operate and can usually be done while still on the bike by simply pushing down on the foot lever with your left foot. Once you feel both feet of the center stand in contact with the ground, transfer your weight up off of the seat and onto the foot lever of the center stand. The stand should rotate under the bike and a bit forward lifting the bike quite easily. CAUTION: Never attempt to raise the bike with a passenger on board, as you will damage the foot lever. You can also raise the bike on the center stand by using the following traditional method: Place the bike on the side stand and step off to the side. From the left side of the bike, push the bike up to the vertical position and press down on the foot lever until both feet of the stand are in contact with the ground. Now apply weight to the foot lever while lifting up on the bike. For cleaning the rear wheel: first place a ½-inch piece of plywood under the stand and use this (beside the bike) method for placing the bike up on the plywood spacer; this will allow the wheel to rotate freely for cleaning. Do not try this while on the bike, as it will require too much foot pressure on the lever. You now have two options to get the bike off of the stand: You can simply rock the bike forward, or put the bike in gear and drive off in most cases as long as you are parked on a flat, level surface. Tips for solving common problems: If you have the correct height stand and you still have difficulty getting the bike up on the stand check the following: the bike must be in neutral, the wheel should be straight forward and not cocked, do not hold the front brake lever and make sure you have 15 lb or more air pressure in the rear suspension. These are the most common problems we encounter.

Harley-Davidson The WHEELDOCK EZ-UP Center Stand Installation MANUAL

0

Filed Under (Harley Davidson) by admin on 21-03-2012

download
Unlike other center stands, the WHEELDOCK EZ UP stand requires very little effort to operate and can usually be done while still on the bike by simply pushing down on the foot lever with your left foot. Once you feel both feet of the center stand in contact with the ground, transfer your weight up off of the seat and onto the foot lever of the center stand. The stand should rotate under the bike and a bit forward lifting the bike quite easily. CAUTION: Never attempt to raise the bike with a passenger on board, as you will damage the foot lever. You can also raise the bike on the center stand by using the following traditional method: Place the bike on the side stand and step off to the side. From the left side of the bike, push the bike up to the vertical position and press down on the foot lever until both feet of the stand are in contact with the ground. Now apply weight to the foot lever while lifting up on the bike. For cleaning the rear wheel: first place a ½-inch piece of plywood under the stand and use this (beside the bike) method for placing the bike up on the plywood spacer; this will allow the wheel to rotate freely for cleaning. Do not try this while on the bike, as it will require too much foot pressure on the lever. You now have two options to get the bike off of the stand: You can simply rock the bike forward, or put the bike in gear and drive off in most cases as long as you are parked on a flat, level surface. Tips for solving common questions: If you have the correct height stand and you still have difficulty getting the bike up on the stand check the following: the bike must be in neutral, the wheel should be straight forward and not cocked, do not hold the front brake lever and make sure you have 15 lb or more air pressure in the rear suspension. These are the most common problems we encounter

SUZUKI SV 1000 RADIATOR (COOLING SYSTEM) SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
FI SYSTEM MALFUNCTION CODE AND DEFECTIVE CONDITION MALFUNCTION CODE DETECTED ITEM DETECTED FAILURE CONDITION CHECK FOR COO NO FAULT C11 Camshaft position sen- sor The signal does not reach ECM for more than 3 sec . after receiving the starter signal . The camshaft position sensor wiring and mechanical parts (Camshaft position sensor, intake cam pin, wiring/coupler con- nection) C12 Crankshaft position sensor The signal does not reach ECM for more than 2 sec . after receiving the starter signal . The crankshaft position sensor wiring and mechanical parts (Crankshaft position sensor, wiring/coupler connection) C13 Intake air pressure sensor The sensor should produce following voltage . (0.50 V < sensor voltage < 4 .85 V) Without the above range, C13 is indicated. Intake air pressure sensor, wiring/coupler connection C14 Throttle position sen- sor The sensor should produce following voltage . (0.20 V < sensor voltage < 4 .80 V) Without the above range, C14 is indicated. Throttle position sensor, wiring/coupler connection C15 Engine coolant temperature sensor The sensor voltage should be the following. (0.15 V <_ sensor voltage < 4 .5 V) Without the above range, C15 is indicated. Engine coolant temperature sensor, wiring/coupler connection C21 Intake air temperature sensor The sensor voltage should be the following. (0.15 V < sensor voltage < 4 .5 V) Without the above range, C21 is indicated. Intake air temperature sensor, wiring/coupler connection C22 Atmospheric pressure sensor The sensor voltage should be the following. (0.50 V < sensor voltage < 4 .5 V) Without the above range, C22 is indicated. Atm. pressure sensor, wiring/coupler connection C23 Tip over sensor The sensor voltage should be the following for more than 2 sec . after ignition switch turns ON . (0 .20 V < sensor voltage < 4 .80 V) Without the above value, C23 is indicated. Tip over sensor, wiring/coupler connection C24 or C25 Ignition signalCrankshaft position sensor signal is produced and ECM determines the ignition signal but signal from ignition coil is interrupted continuous by 4 times or more. In this case, the code C24 or C25 is indicated. Ignition coil, wiring/coupler connection, power supply from the battery SERVICING INFORMATION 8 .3 C28 Secondary throttle valve actuator No operating voltage is supplied from the ECM, C28 is indicated. STVA can not operate. STVA lead wire/coupler, STVA C29 Secondary throttle valve position sensor The sensor should produce following voltage . (0.10 V < sensor voltage < 4 .90 V) Without the above range, C29 is indicated . Secondary throttle position sensor, wiring/coupler connection C31 Gear position signalGear position signal voltage should be higher than the following for more than 2 seconds. (Gear position switch voltage >_ 0 .6 V) Without the above value, C31 is indicated. Gear position sensor, wiring/coupler connection, gearshift cam, etc. C32 or C33 Fuel injector Crankshaft position sensor signal is produced and ECM determines the injection signal but fuel injection signal is interrupted continuous by 4 times or more. In this case, the code C32 or C33 is indicated. Injector, wiring/coupler connection, power supply to the injector C41 Fuel pump relay No voltage is applied to fuel pump although fuel pump relay is turned ON, or voltage is applied to fuel pump although fuel pump relay is turned OFF . Fuel pump relay, connecting lead, power source to fuel pump relay C42 Ignition switchIgnition switch signal is not input in the ECM . Ignition switch, lead wire/coupler C44 Heated oxygen sensor (HO2S) [For E-02, 19] During 02 feedback control, 02 sensor voltage is higher or lower than the specification . No signal is detected during engine operation or no electrical power is supplied from the battery . HO2S lead wire/coupler connection Battery voltage supply to the HO2S C49 PAIR control solenoid valve (PAIR valve) When no operating voltage is supplied from the ECM, C49 is indicated. PAIR valve can not operate. PAIR valve lead wire/coupler

1992 Toyota Cressida Vehicle Wiring Chart and Diagram

0

Filed Under (Toyota Manuals) by admin on 18-06-2011

Download
Listed below is the vehicle specific wiring diagram for your car alarm, remote
starter or keyless entry installation into your 1992 Toyota Cressida . This
information outlines the wires location, color and polarity to help you identify the
proper connection spots in the vehicle. Please be sure to test all of your wires
with a digital multimeter before making any connections. More information on
using a multimeter and testing wires please see our Technical Support Area.

Triumph Bonneville America And Speedmaster The Freak Installation Instructions and Parts List

0

Filed Under (Triumph) by admin on 29-10-2010

download
INSTALLATION In order to install The Freak, the factory air-box must be removed. Because of it’s design, the factory air-box is not an item that is easily removed. There are several parts that must be removed in order to get the air-box out of the bike in one piece. We recommend using the following method to remove your air box without having to cut it into smaller pieces in order to get it out of the frame. 1. PARTS REMOVAL In order to gain access to the air-box, it is necessary to remove certain parts of the motorcycle to gain access to the air-box area of the frame. Removing the following parts should be the first steps you take. A. Seats – Remove both seats starting with the passenger pillion, if applicable. B. Side cover and grommets – Remove the plastic side cover on the right side (throttle side) of your motorcycle. This is the faux oil-tank cover that has the name of your bike on it. Underneath the side cover there are three rubber grommets (1 on the frame tab, and two on the air-box) that support the side cover. Remove the two that are on the air-box and leave the one on the frame. You will attach the two that you removed to the right side bracket in Section 4C . C. Faux air filter covers – On the right side of the bike, remove the chrome faux air filter covers, by removing the one allen head screw that holds it onto the air-box. On the left hand side (clutch side) remove the faux air filter cover in the same manner, you removed the one on the right. D. Plastic shrouds – on the left side, remove the black plastic air-box shroud, by removing the two allen head screws holding it in place. Then remove the plastic shroud covering your fuse box (this is the piece that surrounds your ignition terminal next to the battery). E. Battery – Remove the battery by unscrewing the torx-head bolt that holds the chrome bracket in place. Remove the chrome bracket and the black plastic cap. Tilt the battery out of the box with the top towards you. Disconnect both battery terminal connectors, negative (-) terminal first. Remove the battery. F. Battery box – Remove the two bolts that hold the battery box to the frame. Pull the battery box out as far as you can, then remove the the ignition terminal from the battery box, by removing the two allen screws that hold it in place from the back. Next, remove the fuse box from the battery box, by pushing it out from the back. It is not necessary to disconnect any of the wiring going to the fuse box, or the ignition terminal. G. Rear fender – Remove the rear fender, by first disconnecting the taillight wires. Follow the wires from the tail light assembly on the inside of the rear fender (left side) towards the front of the bike until you come to the box connector. Disconnect the tail light wires at this connector, being careful not to break it. Once the wiring is disconnected, remove the 6 bolts that hold it to the struts. Have someone hold the fender for you while you are removing all of the bolts so that it does not drop once the bolts are removed. Slide the fender out the rear of the bike. 2. PREPARE THE MOTORCYCLE FOR AIR-BOX REMOVAL To remove the factory air-box without damaging it, it is necessary to lift the bike. We recommend the use of a multi-position ATV/motorcycle jack with a minimum lift height of 10″. A. Setting up the lift – Place the lift under your bike and secure your bike to the lift according to the lift manufacturer’s instructions. B. Raise slightly – Lift the motorcycle to the point where the rear springs are without tension, but NOT to where the rear tire is off the ground. C. Remove the rear springs – Take off each of the rear springs by removing the the two bolts on each spring. Once all the bolts are removed gently pull the springs out off of the studs. If they do not pull off easily, you can raise or lower the bike slightly with the lift to ease tension on the spring. Remember, you should not have the rear tire off the ground at this point. The bike should only be raised enough to relax the tension in the springs. D. Remove the mufflers – Remove the mufflers by loosening the clamp at the exhaust header, and by removing the rear foot peg hangers. If the mufflers are not removed, they can become damaged by the axles in Section 2H . E. Disconnect the carburetors – With a small flathead screwdriver, pull the retainer springs out of the channel of the carburetor intake tubes (the two large black tubes coming from the air box into the back of each carburetor), and simply push them towards the air box off of the carbs

Related Item : 2007triumph scrambler parts break down (2)1999 r1100rt starter diagram (2)box r-421 (2)kinroad motorcycle fuse box (2)pictures of where wiring mounts under gas tank of 2001 yz 125 (2)how do i install oil seals in a rokon miter box (2)pocket bike carb leaking out of breather (1)pictures of where cdi mounts under gas tank of 2001 yz 125 (1)preloading moutain bike (1)rear tail section 1988 flhtc (1)